Pre-Bid Date: 
November 9, 2017 - 1:00pm
Bid Date: 
November 28, 2017 - 2:00pm
The work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, mechanical systems, electrical systems, interior finishes and associated work for the addition and improvements of the Norfolk YMCA building. Invited General Contractors: Beckenhauer Construction, Inc. B-D Construction, Inc. Chief Construction Hausmann Construction Sampson Construction CompanyRead more
Pre-Bid Date: 
October 24, 2017 - 3:30pm
Bid Date: 
November 9, 2017 - 2:00pm
The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, mechanical systems, electrical systems, interior finishes and associated work for the classroom addition at the south end of the East Butler High School building.Read more
Pre-Bid Date: 
September 19, 2017 - 3:30pm
Bid Date: 
October 5, 2017 - 2:00pm
Project consists of the addition of classrooms with restrooms, offices, a conference room, cafeteria expansion, and new entry to the David City Elementary School. The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, roofs, structural systems, mechanical systems, electrical systems, interior and exterior finishes and associated site work for the addition at David City Public Schools elementary building.Read more
Pre-Bid Date: 
September 15, 2017 - 9:00am
Bid Date: 
September 29, 2017 - 2:00pm
Sampson Construction Company and Building Crafts Inc. have been invited to submit proposals for General Contracting. Interested Subcontractors are invited to submit bids to them for this project. Project consists of 2 levels of office space above 2 levels of parking and site development indicated on the drawings and specifications, including but not limited to the following Office building, below floor parking and building addition. The components of the project shall include the following items, as well as other trades as documented in the contract documents. Selective demolition, site clearing, Skywalk and earthwork operations, concrete foundations, cast in place post-tensioned structure systems, metal stud load bearing and non-load bearing walls, concrete and brick masonry construction, structural steel beams, columns and joists, metal fabrications, gypsum drywall, carpet, painting, ceramic tile, resilient base, lay-in acoustical tile ceilings, solid core wood doors, hollow metal doors, frames and borrow lites, aluminum storefronts and curtainwall, millwork and other miscellaneous construction.Read more
Pre-Bid Date: 
June 29, 2017 - 3:00pm
Bid Date: 
July 18, 2017 - 2:00pm
The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, roofs, structural systems, mechanical systems, electrical systems, interior and exterior finishes and associated site work for the addition of a preschool facility at Sterling Public Schools building.Read more
Bid Date: 
May 12, 2017 - 1:00pm
The project work shall consist of furnishing all labor, materials, and equipment Concrete Flatwork at the Square at 48 - TIF and associated incidental items of work as specified in the contract specification and indicated on the drawings.Read more
Pre-Bid Date: 
April 11, 2017 - 4:00pm
Bid Date: 
April 27, 2017 - 2:00pm
The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, mechanical systems, electrical systems, interior finishes and associated work for the renovation of East Butler High School building.Read more
Pre-Bid Date: 
March 29, 2017 - 10:00am
Bid Date: 
April 6, 2017 - 2:00pm
Project consists of: Repointing the entire exterior masonry façade with the exception of recent additions, removal and replacing existing caulking around all openings, removal and replacing of some windows, removal and replacement of storm drainage and some extension of the existing membrane roofing.Read more
Pre-Bid Date: 
March 17, 2017 - 9:00am
Bid Date: 
March 31, 2017 - 12:00pm
Project consists of all construction indicated on the drawings and specifications, including but not limited to a new four-story 50,000 square foot corporate office building, parking and site development.Read more
Pre-Bid Date: 
March 16, 2017 - 3:00pm
Bid Date: 
March 30, 2017 - 2:00pm
The Work of the Project involves all construction indicated on the drawings, included but not limited to the following: removal of the existing demountable wall system and construction of a new wall along the west side of the large conference room, including the installation of egress doors, and associated electrical and finish work.Read more