The Clark Enersen Partners Plan Room

The Clark Enersen Partners Plan Room

Bid Date: 
November 12, 2020 - 2:00pm
Project Description: The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Removal of an existing asphalt track and Construction of a new asphalt track and field events. Project Location: 100 N Main Street, Atkinson, Nebraska 68713 Bid Date/Time: November 12, 2020 at 2:00 pm Bid Location: West Holt Public Schools...Read more
Pre-Bid Date: 
October 26, 2020 - 9:00am
Bid Date: 
November 10, 2020 - 2:00pm
Project Description : Interior Renovation of the existing Biological and Agricultural Engineering Machinery Laboratory Space in the NE portion of the basement level of Seaton Hall. Work includes selective demolition and new construction of architectural, mechanical, electrical, and plumbing systems, as well as the addition of fire suppression in the project area. Pre-Bid Meeting Mandatory: 10-26-...Read more
Pre-Bid Date: 
May 6, 2020 - 1:30pm
Bid Date: 
May 19, 2020 - 2:00pm
Project Description: Existing four-story building of Type II-A construction. Primary Occupancy Classification is Business Occupancy and the building will be fully sprinkled throughout with an automatic sprinkler system. Renovation to include new interior finishes, an updated elevator cab, mechanical and electrical systems and high-performance glazing. Roof structure is concrete on metal deck...Read more
Pre-Bid Date: 
April 2, 2020 - 3:30pm
Bid Date: 
April 16, 2020 - 2:00pm
Project Description: Project consists of the renovation of three existing restroom groupings at the Centennial Public School. The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, mechanical systems, electrical systems, interior finishes and associated site work for the renovation...Read more
Bid Date: 
April 9, 2020 - 2:00pm
Project Description: The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Removal of an existing asphalt track and Construction of a new asphalt track and field events. Project Location: 100 N Main Street, Atkinson, Nebraska 68713 Bid Date/Time: April 9, 2020 at 2:00 pm Bid Location: West Holt Public Schools...Read more
Pre-Bid Date: 
March 19, 2020 - 3:30pm
Bid Date: 
April 7, 2020 - 2:00pm
Project Description: Project consists of the replacement of fire alarm system, including the removal of all existing devices, at Seward High School Project Location: 532 Northern Height Drive, Seward, Nebraska Bid Date/Time: April 7, 2020 at 2:00 pm Bid Location: Seward Public Schools District Office, 410 South Street, Seward, NE 68434 **Bids will be opened publicly Prebid Date/Time: March 19,...Read more
Pre-Bid Date: 
March 19, 2020 - 3:30pm
Bid Date: 
April 7, 2020 - 2:00pm
Project Description: Project consists of the renovation of the existing Family Consumer Science rooms and two existing restroom groupings at the Seward High School. The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, mechanical systems, electrical systems, interior finishes and...Read more
Pre-Bid Date: 
February 4, 2020 - 10:00am
Bid Date: 
February 27, 2020 - 10:00am
Western Nebraska Veterans Home Domestic Water Upgrade – Project A Skilled Nursing HVAC Upgrade – Project B Scottsbluff, Nebraska TCEP No.: 155-169-19 / 155-170-19 Project Description: The Work of Project is defined by the Contract Documents and consists of the following: Domestic Water Upgrade (Project A): The Western Nebraska Veterans Home will undergo a Domestic Water System...Read more
Pre-Bid Date: 
November 20, 2019 - 9:30am
Bid Date: 
December 5, 2019 - 2:00pm
Project Description: Project consists of the addition of eight classrooms, district and high school administration offices, conference rooms, circulation space, and a new secure entry to the David City High School. The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, roofs,...Read more
Pre-Bid Date: 
October 8, 2019 - 10:00am
Bid Date: 
October 29, 2019 - 2:00pm
Project Description: The Work of Project is defined by the Contract Documents and consists of the following: The Western Nebraska Veterans Home will undergo a Domestic Water System Improvement Project to mitigate exposure to legionella bacteria. The project will include implementing a central thermostatic mixing valve in each mechanical room. The shower valves and lavatory faucets will be...Read more

Pages